A steel suspension bridge anchor pylon is subjected to high tensile loads from a primary stay-cable anchored to a concrete footing at and connected to the pylon tower apex at point (coordinates measured in meters). The cable tension exerts a force vector:
A secondary stabilizing strut extends along the direction vector connecting the footing to an auxiliary bedrock anchor.
To evaluate structural stability and foundation shear:
- Decompose the cable force into a vector component parallel to the strut () and an orthogonal shear force component ().
- Determine the scalar magnitude of the compressive load along the strut and the lateral shear load.
- Calculate the moment vector (torque) exerted by the cable tension about the footing origin , where .