Regional Wastewater Effluent Pipeline Routing (Civil & Environmental Engineering)

In civil and environmental engineering infrastructure design, routing utility pipelines across environmentally sensitive terrain requires balancing heavy construction capital costs against environmental preservation. Laying pipelines across protected wetlands requires specialized trenchless horizontal directional drilling (HDD), biological monitoring, and secondary containment liners, making wetland installation significantly more expensive per linear meter than standard open-trench excavation along dry utility rights-of-way.

A Clark County civil engineering design team is designing a high-density polyethylene (HDPE) tertiary-treated wastewater effluent pipeline connecting a newly expanded water resource recovery facility WW to an outfall discharge terminal TT on a regional river.

  • The water reclamation facility WW is located on the northern boundary of a protected wetland corridor of uniform width w=600 metersw = 600\text{ meters}.
  • The outfall discharge terminal TT is located on the southern bank of the wetland corridor, 2000 meters2000\text{ meters} downstream from the facility.
  • Pipeline construction across the sensitive wetland costs $400\$400 per linear meter due to horizontal directional drilling requirements.
  • Once the pipeline crosses the wetland and reaches the southern boundary at point PP, it follows a dry utility right-of-way easement along the riverbank to terminal TT at a cost of $240\$240 per linear meter.
       W (Treatment Facility)
       +
       | \
 600 m |  \  d_wetland = sqrt(600^2 + x^2)  [Cost: $400/m]
       |   \
  -----+----+------------------------------------+ Riverbank Easement
       0    P(x, 0)                             T (Outfall Terminal)
            |<---------- 2000 - x ------------->| [Cost: $240/m]
            |<-------------- 2000 m ----------->|
  1. Formulate the total capital construction cost function C(x)C(x) as a single-variable function of the downstream crossing distance xx.
  2. State the physical context-driven domain for xx.
  3. Differentiate C(x)C(x) and locate all interior critical numbers.
  4. Show how the critical number equation embodies the principles of Fastest Path Across Media and Snell's Law.
  5. Apply the Closed Interval Method to evaluate the critical point against the domain boundary endpoints (x=0x = 0 and x=2000x = 2000), identifying the optimal route coordinates and the total capital cost savings.