A construction management site engineer oversees earthwork and grading for an elevated highway interchange off-ramp. The vertical road elevation profile (in meters above sea level) over the station interval (measured in hundreds of meters) follows the rational descent curve:
To meet AASHTO roadway safety standards, construction grading crews must verify that the road slope (grade) at the merge station matches the connecting collector road grade of () and assemble the tangent grade line equation for surveying stakes.
- Using the difference quotient limit definition, find the instantaneous grade function .
- Calculate the exact slope of the off-ramp at station and determine if it complies with the roadway grade specification.
- Formulate the linear tangent grade equation at to place surveyor reference grade stakes along the embankment.